The office building is deteriorating and there are chronic standing water issues. The owner will demolish and replace this building with something approved in their current zoning.
The project is 18 units. 2 units are owned by the Sponsor as offices with a garage on the 1st floor and office on the 2nd floor. 1 unit will be an Owner Exclusive lounge with full kitchen, baths/showers and gathering space. (For images of design see Gallery on Proposed Page). 15 units are available for sale. We currently have 5 early buyers (all from Ortega).
Each unit is 22' wide, 48' deep and 2-stories tall, delivered as a shell stubbed with water and electric, and with full HVAC and structural reinforcements for use if owner decides to build a second floor or mezzanine.
NO. The walls are constructed from steel-reinforced, solid poured concrete walls with brick exterior. The interior courtyard has drains to the StormTech underground stormwater system. There is a secured drive thru gated entrance on Manitou Ave for access/egress.
The setback will NOT change. There is NO request by the Sponsor to change the current setbacks. The building will be built within the property lines of the current location. There is a white picket fence currently on the property line. Anyone can see this is NOT on Ortega's curb. The setback is approximately 40' from Ortega Blvd. Then we have a 10' landscape buffer so the closest will be 50' from the curb on Ortega Blvd.
Units are delivered as a shell, stubbed with water and electric, and with full HVAC and structural reinforcements for use if owner decides to build a second floor or mezzanine. Each owner will decide how to finish the interior and for what use, as long as it's within the zoning allowances.
NO. There are only 15 units for sale. We expect that residents of Ortega will be the buyers and the product will enhance the community. We have 5 early buyers (all in Ortega) at this time.
Overflow parking will be available in the interior courtyard.
We have designed underground stormwater detention using the StormTech product. Almond Engineering will complete the design and manage its implementation. Eric Almond from Almond Engineering will attend the community meeting on Sept. 19th to present this solution and explain how it benefits the environment.
The current parking lot is underwater with every rain and takes days to empty. The new solution will eliminate standing water and minimize mosquitos.
NO. There are STRICT policies in the condo rules and regulations prohibiting anyone from working on vehicles on the premises.
The units are constructed from steel-reinforced, solid poured concrete walls. Any noise from within a unit cannot be heard outside or next door. The project is open to setting noise limitations if Ortega communicates this to us. We continue to be open to valuable conversation.
Each unit is an independently owned condominium. It's up to the owner to decide as long as they get Association approval of the applicant.
The building is 25.5’ tall, or 2 – stories. No taller than the condominiums across the street.
NO. There are no residential units on the property.